| Application Ref | Applicant | App Proposal | Address | Date Rec: | Type | Parish |
|
08/01710/STOUTE
| Sterling Capitol Goole Limited | Outline - Mixed B1, B2 and B8 employment development, Hotel, Class A3, A4 and A5 facilities, Car Showrooms and associated landscaping and engineering works | Land North And East Of Guardian Glass
Capitol Park
Rawcliffe Road
Goole
East Riding Of Yorkshire
| 26/3/2008 | Strategic - Major Outline with EIA | Airmyn Parish Council |
|
08/01720/STPLFE
| Sterling Capitol Goole Limited | Erection of 2 no. Distribution Warehouses (B8) with ancillary facilities and associated landscaping and engineering works and construction of Phase 2 Spine Road | Capitol Park
Rawcliffe Road
Goole
East Riding Of Yorkshire
| 26/3/2008 | Strategic - Major Full with EIA | Goole Town Council |
|
09/01174/STPLF
| Composite Energy | Construction of a drilling site with associated access to drill an appraisal borehole for the purposes of mineral exploration (coal bed methane) | Land North Of Oxmardyke Grange
Oxmardyke Lane
Blacktoft
East Riding Of Yorkshire
| 30/3/2009 | Strategic - Major Full | Blacktoft Parish Council |
|
11/02135/STPLF
| Slingsby Plant Hire Limited | Remediation of existing Dis-used Quarry by means of excavating and removal of materials off site for appropriate disposal | Middleton Quarry
Heck And Pollington Lane
Pollington
East Riding Of Yorkshire
| 17/5/2011 | Strategic - Major Full | Pollington Parish Council |
|
11/02561/STPLF
| Model Textile Trading Corporation And Others | Hybrid Application for: (1) Outline application for residential development site of 25.48 hectares; (2) Full application for the erection of no: 153 dwellings and garages for Phases 1 and 2; (3) Full application for the details for the open space and public realm, allotment community building, allotment shed and sub-station; (4) Full application for the details for a relief road between Station Road and Selby Road and (5) Full application for engineering works on land north of the Paternoster drain | Land Between Station Road And Selby Road
Selby Road
Howden
East Riding Of Yorkshire
| 9/6/2011 | Strategic - Major Full | Howden Town Council |
|
11/03236/STVAR
| Mr Karl Lerums | Variation of condition 25 (traffic management) of planning permission 01/01749/OUT | Land North West Of
St Stephens Villa
27 Main Road
Newport
East Riding Of Yorkshire
| 18/7/2011 | Strategic - Variation of Condition(s) | Newport Parish Council |
|
11/04104/STOUTE
| The Brough South Consortium | Outline - Erection of mixed use redevelopment comprising a primary school (Use Class D1), residential (Use Class C3) (maximum 750 units); business (B1, B2 & B8); food and non-food retail (A1) (including foodstore circa 3250 sqm gross); food and drink (A3 & A4); hotel (C1); residential care home (C2); healthcare (D1), children's nursery (D1) and leisure (D2) uses along with car showroom and petrol filling station and incorporating associated new access (to include construction of Phase 3 of the Brough Relief Road), transport interchange and railway station parking, junction improvements to Welton Road A63, associated infrastructure and landscaping works (All matters reserved) | Land At Ings Lane And East Of Skillings Lane
Ings Lane
Brough
East Riding Of Yorkshire
| 1/9/2011 | Strategic - Major Outline with EIA | Elloughton Cum Brough Parish Council |
|
11/05923/STPLFE
| RWE Npower Renewables Ltd | Erection of No.17 wind turbines (80m to hub and 126.5m to tip), No.1 meteorological mast, No.1 substation/control building and creation of a new access with associated infrastructure including access tracks, crane hardstandings and underground cabling | Land South West Of White House Farm
Swinefleet Road
Goole Fields
East Riding Of Yorkshire
| 19/12/2011 | Strategic - Major Full with EIA | Goole Fields Parish Council |
|
11/05745/STPLFE
| British Telecommunications Plc | Erection of 5 no. wind turbines (height to tip 110 metres), 1 no. anemometer meteorological mast (height to top 64 metres), creation of 2 no. access tracks and permanent internal access tracks, cable trenches, hardstanding areas, contractors compound and switch room | Land South Of
Warmer Lane
Easington
East Riding Of Yorkshire
| 6/12/2011 | Strategic - Major Full with EIA | Easington Parish Council |
|
12/00570/STPLFE
| SSE Hornsea Limited AND Statoil (UK) Limited | Relocation of wellhead platform, installation of underground leaching pipework, electrical control cabin, underground gas pipework and construction of new site entrance and access road from B1242 to wellhead platform, construction of temporary access roads and contractors compound for above works (originally approved under 06/09372/STPLFE) | SSE Gas Storage Facility
Garton Road
Aldbrough
East Riding Of Yorkshire
HU11 4QA
| 6/2/2012 | Strategic - Major Full with EIA | East Garton Parish Council |
|
12/00640/STPLFE
| Fraisthorpe Wind Farm Limited | Erection of 9 no. wind turbines (80m to hub and 130m to tip), 1 no. meteorological mast, control building and ancillary development including access tracks and hardstandings | Land North East Of
Manor Farm
Main Street
Fraisthorpe
East Riding Of Yorkshire
YO15 3QP
| 10/2/2012 | Strategic - Major Full with EIA | Barmston And Fraisthorpe Parish Council |
|
12/02652/STOUT
| York Heritage Limited | Outline - Erection of 80 no. bed carehome and 24 no. supervised bungalows with associated access and parking (access, layout and scale to be considered) (Re-submission of 11/04180/STOUT) | Land North Of
Spring House Farm
Feoffee Common Lane
Barmby Moor
East Riding Of Yorkshire
| 31/5/2012 | Strategic - Major Outline | Barmby Moor Parish Council |
|
12/04154/STPLF
| Able Humber Ports Ltd | Excavation of land to create lagoons, islands and water storage to include the abstracting of water from Keyingham Drain by means of two 11.5 metre high wind pumps | Land South Of Sands Farm
Cherry Cobb Sands Road
Paull
East Riding Of Yorkshire
| 1/10/2012 | Strategic - Major Full | Sunk Island Parish Council |
|
13/00698/STPLFE
| Volkswind UK Ltd | Erection of 2 no. wind turbines (height to tip 125m and height to hub 80m), access track and ancillary works including temporary anemometer mast and substation building [Turbine 1 E477688 N432281, Turbine 2 E477887 N432667] | Land South West Of Ivy House Farm
Holme Road
Spaldington
East Riding Of Yorkshire
DN14 7GX
| 4/3/2013 | Strategic - Major Full with EIA | Spaldington Parish Council |
|
12/04725/STOUT
| Mr John McGrory | Outline Residential Development (access and layout to be considered) | Land South Of
Balk Lane
Hook
East Riding Of Yorkshire
DN14 5NQ
| 20/11/2012 | Strategic - Major Outline | Hook Parish Council |
|
13/01077/STVAR
| Brookfield Group | Variation of condition 41 (approved plans) of planning reference 11/05208/STPLF (relating to the Petrol Filling Station) to increase size of amenity block and provide an additional jet wash | Hodsow Field East Of
Pocklington Airfield Industrial Estate
Lincoln Road
Barmby Moor
East Riding Of Yorkshire
| 20/3/2013 | Strategic - Variation of Condition(s) | Barmby Moor Parish Council |
|
13/00374/STVAR
| Tesco Stores Limited | Variation of condition 31 of planning permission 06/08408/STPLF - hours of opening of gates at vehicular access points onto Middle Street and George Street (Renewal of planning permission 09/03428/STVAR) | Tesco
George Street
Driffield
East Riding Of Yorkshire
YO25 6RA
| 6/2/2013 | Strategic - Variation of Condition(s) | Driffield Town Council |
|
13/00379/STOUTE
| Hull And East Yorkshire Hospitals NHS Trust | Outline - Erection of mixed use development comprising a primary school (Use Class D1), residential (Use Class C3) (maximum 600 units including key worker housing); food and non-food retail (A1); food and drink (A3 & A4); residential care home (C2); healthcare (D1), landscaping, play spaces, allotments, sports pitches and changing facilities and surface water attenuation, and incorporating associated new access to include provision of a roundabout and re-alignment of Castle Road, widening of Willerby Low Road and creation of access point (Access to be considered) | Playing Fields
Castle Road
Cottingham
East Riding Of Yorkshire
| 8/2/2013 | Strategic - Major Outline with EIA | Cottingham Parish Council |
|
12/04401/STOUT
| Mr Robert Hogg | Outline application for residential development of up to 21 dwellings (All Matters Reserved) | Field House
Bridlington Road
Driffield
East Riding Of Yorkshire
YO25 5JG
| 24/10/2012 | Strategic - Major Outline | Driffield Town Council |
|
12/04441/STVARE
| East Yorkshire Power Ltd | Variation of conditions re condition 10 (approved plan) and condition 40 (approved plans) of application 10/01123/STOUTE | Gameslack Farm
Beverley Road
Fimber
East Riding Of Yorkshire
YO25 9LT
| 29/10/2012 | Strategic - Variation of Cond with EIA | Fimber Parish Council |
|
13/01131/PLF
| Mr C Barker | Continued use of land as Caravan site on west side of lake | Greengrass Park
Hempholme Road
Burshill
East Riding Of Yorkshire
YO25 8NB
| 3/4/2013 | Full Planning Permission | Brandesburton Parish Council |
|
13/00953/STPLF
| The Pure Leisure Group | Change of use of Land for the siting of timber lodges | The Links Golf Course
Flamborough Road
Sewerby
East Riding Of Yorkshire
YO15 1DW
| 20/3/2013 | Strategic - Major Full | Bridlington Town Council |
|
12/04561/STPLFE
| RWE Npower Renewables Ltd (RWE NRL) | Erection of No.6 wind turbines (up to 81.5m to hub, 128m to tip) with associated crane hard-standing, external transformers, sub-surface cabling and on site access tracks, with ditch culverts where required, erection of a sub-station building and compound, temporary construction compounds, No.1 permanent and No.1 temporary bridge and No.1 permanent and No.1 temporary meteorological mast | Land North West Of
Welham Bridge West
Howden Road
Holme Upon Spalding Moor
East Riding Of Yorkshire
| 7/11/2012 | Strategic - Major Full with EIA | Holme On Spalding Moor Parish Council |
|
13/00438/STOUT
| The Crown Estate | Outline - Erection of up to 87 dwellings with associated play area, open space, balancing pond, access and ancillary works (access to be considered) | Land North And West Of Benningholme Lane Playing Field
Benningholme Lane
Skirlaugh
East Riding Of Yorkshire
| 11/2/2013 | Strategic - Major Outline | Skirlaugh Parish Council |
|
13/00991/PLF
| Mr C Barker | Continued use of land as Caravan site on east side of lake | Greengrass Park
Hempholme Road
Burshill
East Riding Of Yorkshire
YO25 8NB
| 22/3/2013 | Full Planning Permission | Brandesburton Parish Council |
|