| Part of Queen Street (parking area only), Bridlington. From | 18/05/2009 - 26/02/2010 | Refurbishment to the Library. | Lane Closure : Parking area only will be closed. The parking area will be closed to Emergency Services and through traffic, but open at all times to pedestrians. | N/A. |
|
| Railway Bridge, Nunburnholme Avenue, North Ferriby. From | 07/09/2009 - 12/02/2010 | Complete reconstruction of the bridge. | Full Road Closure : Road will be closed to all users. | Diversion for Traffic is Via Parkfield Avenue, New Walk, Church Road, Ings Drive, Humber Road and Marine Avenue, North Ferriby. Diversion for Pedestrians is Via Parkfield Avenue, Station Road and Marine Avenue, North Ferriby. |
|
| Frodingham Road, Wansford. B1249. From See **. | 13/08/2009 - 13/08/2010 | Repairs to the B1249 Nafferton drain bridge parapet works. | Speed Restriction : Temporary 40mph speed restriction. ** Frodingham Road, Wansford from approximately 250 metres north west of its junction with Brigham Lane, Brigham and Cruckley Lane, Foston crossroads for a distance of approximately 700 metres in a | N/A. |
|
| High Street, Boynton. From property called "Low Caythorpe" eastbound for approx. 1230 m To property called "Binsdale Farm". | 17/08/2009 - 30/06/2010 | Installation of a new water main and archaeological activities. | Speed Restriction : Temporary 30mph speed restriction. | N/A. |
|
| Main Road and part of Holmes Lane, Bilton. B1238/39. From | 07/09/2009 - 08/03/2010 | Carriageway and footway resurfacing, drainage, kerbing, road markings and anti-skid surfacing. | Temporary Traffic Signals : 2 Way Signals 09.15 to 15.15. Main Road closure will be from 15 February until 1 March 2010, after which traffic signals will remain until 8 March 2010. Holmes Lane closure has been postponed until April 2010. The roads will | Main Road Diverted via Holmes Lane/Ganstead (2 weeks from 5 January until 18 January 2010) Holmes Lane Diverted via Main Road/Ganstead (1 week from 19 January until 25 January 2010) |
|
| South Marine Drive, Bridlington - PHASE 1. From | 28/08/2009 - 31/03/2010 | Major carriageway reconstruction works. | Lane Closure : Suspension and closure of parking bays - East side from a point 23 metres south west of the Spa slipway access road in a south westerly direction for a distance of 63 metres. West side from a point 10 metres south west of the Pembroke Terr | N/A. |
|
| South Marine Drive, Bridlington - PHASE 2. | 21/09/2009 - 31/03/2010 | Major carriageway reconstruction works. | Lane Closure : 1) Suspension and closure of parking bays; East side from its southern junction with Mayfield Road in a southerly direction approx. 285 metres to the northern boundary of the bowling green. 2) Suspension and closure of "No Waiting/Loading | N/A. |
|
| South Marine Drive, Bridlington - PHASE 4. From its junction with Pembroke Terrace To 30m south of Trafalgar Crescent. | 01/02/2010 - 31/03/2010 | Location 1) Reconstruction of highway/footway and adjacent to Pembroke Gardens. Location 2) Works to Foreshore embankment and adjacent footway. | Full Road Closure : Location 1) Road Closure: South Marine Drive from Lifeboat Station to Pembroke Terrace. Location 2) Temporary Signals in operation 24-hours: South Marine Drive from a point 30m south of Trafalgar Crescent to Mayfield Road. The road w | Diversion is via: Northbound: - South Cliff Road, West Street, Richmond Street, Cardigan Road, Horsforth Avenue, Roundhay Road and Belgrave Road. Southbound: - Belgrave Road, Roundhay Road, Horsforth Avenue, Cardigan Road, Hilderthorpe Road and South Cliff Road. |
|
| Pembroke Terrace, Bridlington. From Its junction with South Cliff Road/South Marine Drive. To Its junction with South Street, in a Westerly direction. | 24/08/2009 - 01/06/2010 | Carriageway Reconstruction. | Lane Closure : "One-Way" traffic regulation order, westerly direction. The emergency "one-way" system is necessary to enable ease of traffic flow whilst the carriageway reconstruction is underway and to be carried out in a manner consistent with ensuring | The route for traffic affected by the one way system is via, South Street, West Street and South Cliff Road. |
|
| Outside Market Hill House, Market Hill, Hedon. From | 02/11/2009 - 24/02/2010 | Building works. | Full Road Closure : The roads will be closed to all traffic including the Emergency Services, however pedestrian access will be unaffected. | Alternative route is via Market Hill, Church Gate, Hedon. |
|
| Part of Belvedere Parade, Bridlington. From South Cliff car park in a northerly direction To approx. 100 metres. | 16/11/2009 - 30/04/2010 | Construction of the Park and Ride turning area. | Full Road Closure : The road will be open to Emergency Services and for access to the Café (via C Spencer Ltd site), but closed to pedestrians and through traffic. | N/A. |
|
| Ferriby High Road, North Ferriby. From Swanland Hill To Hotel Elizabeth. | 16/11/2009 - 12/02/2010 | Construction of a combined footway / cycleway. | Temporary Traffic Signals : From 8.00am to 4.00pm. | N/A. |
|
| Kingston Road/Gorton Road roundabout, Willerby. | 04/01/2010 - 13/02/2010 | Footway/cycleway alterations. | Footpath Closure : Partial footpath closure. | N/A. |
|
| Springfield Way, Anlaby. | 04/01/2010 - 18/03/2010 | Footway/cycleway alterations. | Temporary Traffic Signals : Give and Take with the occasional use of temporary traffic lights, as required. Daytime only. | N/A. |
|
| Great Gutter Lane West, Willerby. From | 18/01/2010 - 16/02/2010 | Replace sewer. | Temporary Traffic Signals : From 7.30am to 5.00pm. | N/A. |
|
| Sutton Bridge from River Derwent Crossing. B1228. From | 08/01/2010 - 31/03/2010 | Bridge stone repairs and associated roadworks following vehicle impact damage. | Full Road Closure : Provisional completion date for the closure is 31 March 2010. No access for the Emergency Services. Pedestrian access (only) maintained until commencement of main works (date to be notified). | Signed advisery diversion route. |
|
| Field Lane, Elstronwick. From | 25/01/2010 - 12/02/2010 | Kerbing, haunching and overlay works. | Temporary Traffic Signals : Daytime only. | N/A. |
|
| Outside Coletta & Tyson, 324 Hull Road, Woodmansey. From | 01/02/2010 - 15/02/2010 | Drainage works, installation of culvert. | Temporary Traffic Signals : From 09.00am to 3.30pm. | N/A. |
|
| 43 Northgate, Hessle, HU13. From | 03/02/2010 - 09/02/2010 | New gas service. | Temporary Traffic Signals : Temporary signals in operation 24-hours. | N/A. |
|
| A161 Swinefleet. A161. From Mini r/bout at jcnt of Low St, Church St & Kings Causeway To Reading Gate 30mph speed limit sign.. | 08/02/2010 - 26/02/2010 | Carriageway resurfacing and associated works. | Temporary Traffic Signals : Temporary Signals from 08/02/10 to 19/02/10. Road Closure from 22/02/10 to 26/02/10. Temporary one-way traffic & Temporary prohibition of traffic exceeding 7.5 tonnes also. The road will be closed to all traffic including Em | The alternative route is via Church Lane, Reedness Road, Main Street, Old Lane, A161 Kings Causeway and New Lane. A one-way system will operate from A161, Kings Causeway along New Lane, Main Street and Old Lane to the A161 Kings Causeway. The diversion for vehicles exceeding 7.5 tonnes will be via the A18 and M62. |
|
| Priory Road, Cottingham. From Priory Road To Hull City Boundary. | 02/02/2010 - 08/02/2010 | Carriageway patching. | Temporary Traffic Signals : Between 09.00 to 16.00 hrs. | N/A. |
|
| Gorton Road, Willerby/Anlaby. From Kingston Road To Springfield Way. | 01/02/2010 - 26/02/2010 | Widening of existing footway to allow a shared cycle/footway. | Temporary Traffic Signals : From 7.30 to 17.00 hrs. | N/A. |
|
| Cartwright Lane, Beverley, HU17 8LT. From | 04/02/2010 - 08/02/2010 | Excavate & install duct chambers and reinstate. | Stop/Go Boards : After 9.00am and before 3.00pm. | N/A. |
|
| Walkington Heads, Walkington (Part). From the junction of Burton Gates To the junction of Wold Road. | 08/02/2010 - 19/02/2010 | Structural maintenance works. | Full Road Closure : The road will be open at all times for residents" access and pedestrians only. | The alternative route is via Wold Road, Hunsley Road, West End, East End, Mill Lane, Walkington and Killingwoldgraves Lane, Bishop Burton. |
|
| Bellcroft Lane, Thorngumbald. From | 08/02/2010 - 12/02/2010 | Paving works. | Full Road Closure : From 7.30 to 17.30 hours. The road will be closed to all traffic, however, access will be maintained to properties directly affected by the closure. | The alternative route will be via Hooks Lane, Thorngumbald; Main Road, Camerton; Hull Road, Keyingham; Marsh Lane, Keyingham; Marsh Road, Keyingham and Thorn Marsh Road, Thorngumbald. |
|
| Coniston Lane, Sproatley. | 08/02/2010 - 19/03/2010 | Kerbing, haunching and drainage works. | Full Road Closure : From 7.30 to 17.30 hours. Access will be maintained for residents and Emergency vehicles. | Diversion is via Bilton. |