Highways planned maintenance

As a local highway authority, East Riding of Yorkshire Council has a large network of highways and assets that it is responsible for (see 'What does the council maintain in its role as a highway authority?').

To keep it all serviceable, safe, and sustainable, the council undertakes a significant planned maintenance programme every year. This is maintenance work that is planned, rather than responding reactively.

What highway maintenance works are planned for this year?

Proposed carriageway planned maintenance works

Proposed carriageway planned maintenance works
Map of proposed carriageway planned maintenance works for the East Riding.

Interactive map of proposed maintenance works

The treatment within these works will consist of any of the following:

  • Full reconstruction
  • Inlay or overlay (surface layer replacement)
  • Surface dressing treatment (tar and chippings)
  • Pre-surface dressing patching (PSD - patching prior to following year's surface dressing)
  • Footway patching and slurry sealing.

Please note: the map displays the full surface dressing (SD) programme but does not currently include the full structural planned maintenance programme. This will be updated in due course. All listed schemes are indicative and subject to change. If you require any further details on the planned maintenance programme, please contact civil engineering services via email at: civil.engineering@eastriding.gov.uk.

Further details will appear throughout the year on one.network - Roadworks East Riding (external website).

How do you prioritise what work is done?.

What treatments do you use?

Preventative maintenance is a planned strategy of cost-effective treatments to an existing highway to preserve it, prevent ingress of water, reduce the rate of future deterioration, and increase service life.

Treatments such as surface dressing, micro asphalt, footway slurry sealing are used to preserve and extend the life of roads that are already in a reasonable to good condition. It is crucial that these treatments are undertaken before serious deterioration has taken place rather than repairing inevitable deterioration.

Below is a list of typical treatments with their approximate cost.

Treatments:

Carriageway Reconstruction

Typical estimated cost £75.00/m2

This method is used if the substructure of the road has failed. The existing layers are removed and replaced with new ones, typically 350-600 mm deep. This type of construction can last up to 40 years. It is the most expensive treatment type.

Carriageway reconstruction

Carriageway Inlay

Typical estimated cost £35.00/m2

This method consists of removing the upper layer or layers of the asphalt (typically 100 mm in depth) which are then replaced with new asphalt layers. This process is less intrusive than reconstruction, quicker, less expensive, and is usually used in an urban environment. Design life is typically 10-20 years depending on traffic and loading.

Carriageway Inlay

Carriageway Overlay

Typical estimated cost £25.00/m2

This method consists of laying a new surface without the need to remove the existing surface layer first in most instances. This process can only be used where there are no level constraints such as adjoining private drives, house thresholds, adjoining roads or existing drainage systems and is therefore more suitable in rural locations.

Carriageway Overlay

Deep In-situ Recycling

Typical estimated cost £45.00/m2

This is an alternative treatment to haunching and reconstruction. The existing carriageway layers are pulverised to form the base for the new road construction, typically 250mm deep. This recycled layer is usually overlaid with a final running surface.

This type of construction can last up to 20 years. This process has environmental benefits from recycling material, fewer lorry movements, and a reduced impact on local community.

Deep In-situ Recycling

Ex-situ Recycling (Foam Mix)

Typical estimated cost £30.00/m2

This is an alternative treatment to carriageway inlay. The existing carriageway layers are removed and transported to a recycling facility where the material is used to prepare a foam mix material, typically laid 60-150mm deep. The recycled layer is usually covered with a final running surface. This type of construction can last up to 20 years. This material can also be used for footways and cycle tracks. Similar environmental benefits as in-situ recycling.

Ex-situ Recycling (Foam Mix)

Warm Mix Asphalts (WMA)

This is an alternative to existing ‘Hot Mix’ Asphalts materials but using lower temperatures throughout the process. This can significantly reduce carbon emissions. WMA used for the base of the road construction is typically laid 60-150mm deep.

Trails are being carried out using WMA as a running surface.

Warm Mix Asphalts

Haunching and Widening

Typical estimated cost £90.00/m2

Many of our rural roads are not wide enough to accommodate the widths and weight of modern vehicles. Where this is the case a haunch/widen treatment can provide additional width and strength to carriageways. Typically, depth can range from 150mm to 600mm depending upon expected traffic loading and can involve new sub-base aggregate layers or just asphalt layers to provide the structural strength required.

Haunching and Widening

Patching

Typical estimated cost £50.00/m2

Patching is used either a stand-alone treatment or in advance of surface dressing to address localised deterioration where most of the road is still sound. Failing areas are generally removed mechanically by a planer and replaced with new asphalt which is compacted by roller. Treatment can be carried out with only short-term disruption.

Patching

Surface Dressing (‘Tar and Chippings’)

Typical estimated cost £5.00/m2

Preventative treatments are used to protect the surface layer of the carriageway and stop the appearance of potholes. These treatments are usually carried out when the road is still in a reasonable condition. Dressing also restores texture and grip to the road surface. The process requires dryer and warmer weather so is undertaken each spring/summer and causes minimal disruption. Design life is typically 10 to 15 years depending on traffic and use.

Surface Dressing (‘Tar and Chippings’)

Below is a short video explaining the surface dressing process:

Surface Dressing - East Riding of Yorkshire Council

Preservation

Typical estimated cost £5.00/m2

Preservation applications extends the life of asphalt surfaces. The treatment is highly sustainable as it minimises the need for new aggregate and binder. However, unlike Surface Dressing, it does not improve the texture or grip. The process requires dryer warmer weather but causes minimal disruption. Design life is typically 5 years.

Limited trials are being completed to compare against other preventative treatments.

Preservation

Roadmaster

Typical estimated cost £5.00/m2

The Roadmaster is a Spray Injection Patching machine. A single-man operation, it delivers localised applications of aggregate and binder directly into the pothole or road defect.

Roadmaster offers an immediate and rapid response to local defects.

Roadmaster

Ultra-screed

Typical estimated cost £20.00/m2

Rapid, durable treatment for localised repair of surface defects which can withstand heavily trafficking within 30 minutes of application. High friction surface.

Used for pre-surface dressing patches and screeded in layers to fill minor potholes. Suitable for asphalt and concrete surfaces and all classes of roads.

Ultra-screed

Beverley North Bar Ultra-screed

Footway Reconstruction

Typical estimated cost £75.00/m2

As with carriageways, footway reconstruction is the most expensive treatment and is also the most disruptive option.

However, it is often required on lengths of footway with adjoining private drives where vehicles regularly cross the footway and cause damage to the structure.

Footway Reconstruction

Footway Patching

Typical estimated cost £65.00/m2

Like carriageway patching this is undertaken where most of the footway area is sound and may be in preparation for a further preventative treatment such as slurry sealing. Typically, footways are patched 70mm deep.

Footway Patching

Footway Slurry Sealing

Typical estimated cost £15.00/m2

This treatment is carried out on footways with minor defects such as surface cracking and isolated major faults.

Before slurry sealing, the footway is jet washed, weed sprayed, overgrowing grass cut back and any patching required completed. The cold pre-mixed seal is then spread onto the surface of the footway. It is the most cost effective and least disruptive process for pedestrians.

Footway Slurry Sealing

What does the council maintain in its role as a highway authority?

As the local highway authority, the council maintains a large network of assets to support the public’s highway rights and enable over 26 million journeys a year.

These assets include:

  • 3,500km (2,200 miles) of carriageway
  • 1,900km (1,180 miles) of footways
  • 604 bridges and structures
  • 44,900 street lights
  • 58,000 traffic signs.

The value of all the council’s highway assets is over £4bn, however, there are a number of assets on the highway that the council does not maintain. These include private bridges, some bus shelters and street lights installed by residents or private businesses.

How do you prioritise what work is done?

We must make the most of our existing infrastructure and which means we must get as much out of a road as we can. We do this using preventative treatments where sites are suitable and affordable, and by planning more expensive reconstruction at an appropriate time. Acting too late means low-cost solutions may be unsuitable. Acting too early means we won’t have the money available for other roads in need, leading to more costly repairs later and spiralling highway costs.

Our major maintenance programme is reviewed annually. Every public carriageway and footway in East Riding is assessed each year using the latest available data, including condition surveys, safety records and input from the highway area engineers. The council’s approach to carriageway maintenance is based on available funding and the carriageway asset’s ability to achieving the council priorities. Carriageway investment will focus on keeping the good condition of our strategic and classified routes, (A, B, C).

The data is gathered in autumn to put together prioritised lists for the following financial year. The carriageways are split into four lists: one each for A roads, B roads, C roads and Unclassified roads. Footways are split into two lists: Category 1 and 2 footways (busy urban footways) and Category 3 and 4 footways (less busy links and local access footways). Each programme is then developed by working down the prioritised list to make the best use of our available funding. 5.

The capital funding allocation that we receive from the Department of Transport is split between the different lists using an asset-based methodology, taking into consideration the performance indicators (PIs) that we report annually. This means that each programme has its own budget attached to it.

What funding is available to maintain the roads, and what is it spent on?

The authority receives a capital grant for highway maintenance from the Department for Transport (DfT) each year. This funding is provided for the replacement of existing highway assets, such the replacement of a road when it reaches the end of its life.

Highway Maintenance Funding 2025-26 (pdf 194kb)

We also receive revenue funding from the Department for Communities and Local Government (DCLG). This funding is used for more reactive measures (such as pothole repairs), routine maintenance and other highway duties.

A breakdown of typical spend on highways capital and revenue funding each year:

Asset Type Capital Revenue
Carriageways £14,100,000 £4,840,000
Footways £3,000,000 £1,340,000
Drainage £500,000 £760,000
Structures £3,000,000 £830,000
Street Lighting £1,000,000 £2,990,000
Street Furniture £300,000 £270,000
Traffic Management £100,000 £190,000
Land (forestry and grass cutting) £1,290,000
Winter Maintenance £1,980,000
Total £22,000,000 £14,490,000

We also receive various allocations from the DfT's Road Resurfacing Fund, and from single funding grants, often made available through the Government's annual budget.

How much would it cost to repair all the highways in the East Riding?

The road network is in constant use and is subject to constant wear and tear.

If we wanted to bring all highways up to an ‘as new’ standard, we estimate it would require an investment of £500m. This is sometimes referred to as the maintenance backlog. Regrettably, there is not enough money to fund all schemes and we have to accept that there will always be roads that are not in the best condition.

Considering the amount of funding available, we have to prioritise our planned maintenance work carefully to ensure works offer value for money and maximum benefits for East Riding residents and visitors.

Isn’t it better to do a proper surfacing scheme rather than come back lots of times to fix potholes?

Yes, in the long-term the cost of a surfacing scheme is less per square metre than pothole repairs, and the council does favour preventative rather than reactive maintenance, however, the funding for more expensive surfacing schemes is often not readily available.

It is often necessary to undertake cheaper pothole repairs to keep roads safe as there is insufficient funding to do more expensive major repair works.

We do take account of the ongoing reactive costs associated with pothole repairs when we are producing our prioritised list of planned maintenance schemes each year.

Why don’t you fix all defects when you come to a section of road?

All highways are regularly inspected to identify defects which are likely to cause a hazard to road users. Inspections are also carried out following reports from the public.

We assess the risks of the defects based on their size, depth, and location and determine an appropriate response. We often find that defects do not require immediate attention. Where it is safe to do so, some minor defects are not repaired or are left for a longer period of time in order for more efficient repair methods to be undertaken.

If you see a pothole or defect likely to cause danger please report it online, giving dimensions (width, depth, length) and location in order that appropriate action can be taken.

Road Resurfacing Fund

The Department for Transport’s Roads Resurfacing Fund was announced by the government in November 2023 as part of the Spending Review. The grant funding aims to support local authorities in England to improve the condition and resilience of their local roads through resurfacing of carriageways and footways, as well as tackling other maintenance priorities such as keeping bridges and other highway infrastructure open and safe.

The East Riding of Yorkshire Council received £1.753m from the Road Resurfacing Funding in 2023/24 and £1.753m in 2024/25.

The additional funding has been crucial for maintaining the quality and safety of our highways, especially considering the rising costs in highway materials and labour. The council has been able to support our planned maintenance programme and deliver work that we would have otherwise had to delay until funding was available.

Some of the funding has been directed towards drainage works that have been necessary to improve the resilience of our network after flooding affected the East Riding over the winter period. Without this additional funding, key routes and settlements would be left either inaccessible or disrupted.

It has also allowed the council to optimise its surface dressing programme by investing an additional £350,000, as well as addressing further structural problems on our highway infrastructure.

2023/24 Spend

The funding was invested as follows:

  • Carriageway resurfacing - £812,000 covering over 8,000m2
  • Drainage improvements - £439,000 impacting on 11km of highway
  • Footway repairs - £202,000 improving 4km of footway
  • Safety fencing and traffic signals - £24,000
  • Street lighting refurbishment - £111,000; and
  • Accelerating £165,000 work on West Newton Bridge.

2024/25 Spend

The funding was invested as follows:

  • Carriageway resurfacing - £1,232,000, covering over 120,000m2
  • Drainage improvements - £19,000
  • Footway repairs - £202,000, covering over 215m2
  • Safety fencing and traffic signals - £24,000
  • Street lighting refurbishment - £111,000; and
  • Bridge maintenance - £165,000.

Innovation

In order to make the most of available funding, we are always looking to innovate in the way we deliver a highway service. Improvements in technology and developments in materials are being trialled and adopted as our new way of working.

We have updated our online services to gather public reported information quicker and we are using video and artificial intelligence (AI) to appraise road condition, all helping us to better prioritise repair work and allocate resources more efficiently.

We are using recycling and rejuvenation treatments to make better use of existing material and prolong the life of our surfaces. We are also using warm mix asphalts that can be produced and laid at lower temperatures, all of which is helping us use less resources, less energy, and reducing the carbon emissions our service generates.

We are also challenging what existing infrastructure and activities are needed to deliver the same or better service, such as emptying gullies only when they need emptying and lighting streets only when they need to be lit. Through the LIVELABS2 funding, the council is currently undertaking national trials to determine how we can sustainably manage our lighting, signing and road marking.

StreetWorks

We also want to make sure that the significant investment being made in our highways is not undermined by utility companies digging up new surfaces or by the same spot being dug up again and again unnecessarily.

Our StreetWorks team now liaise with our own road teams and public utilities to coordinate and improve the timing of planned works and improve performance. Formal meetings take place every three months looking at companies’ forward programmes. We also use a permit system to control when companies can work and encourage companies to cooperate by discounting joint-working permit costs.

Samples of the reinstatements are tested to make sure that the repairs will be long lasting and not lead the council to early repair. In addition, we use our highway powers to prevent companies from unnecessarily excavating after a highway has been newly-surfaced.

Funding

As an effective and efficiently performing local authority, East Riding of Yorkshire Council has received needs-based and incentive fund sums from the Department for Transport (DfT) of £7.663m, with a pothole fund allocation of £6.130m, which has been confirmed up to 2024/2025.

The DfT has also award £2.452m of additional funding, most recently a roads resurfacing fund allocation of £1.753m. This means that the council has spent an average of £18.5m per year on planned major maintenance with an additional £1.4m from our operational services funding supporting an expanded surface dressing programme.

Our councillors have recently agreed to increase our operational funding by £0.9m which will include an additional £0.3m for the surface dressing programme.

Capital Funding table
Capital Funding spend 2019 - 2025

Specific Sites 2023/24

LocationMaintenance of
A645 Drax Road, RawcliffeCarriageway
B1240, St Augustines Gate, HedonCarriageway
B1249 Brigham Straight, BrighamCarriageway
Hull Road, WhitedaleCarriageway
Staithes Road, PrestonCarriageway
Halifax Way Ind Est Rd, PocklingtonCarriageway
Nunburnholme Hill, NunburnholmeCarriageway
Church Lane, ThwingCarriageway
Loaningdale, BurnbyCarriageway
A164 Albion Lane, WillerbyDrainage
A164 Leconfield, A164 LeconfieldDrainage
B1233 Harland Way, CottinghamDrainage
B1233 Thwaite Street, CottinghamDrainage
Hull Road, HessleDrainage
Cliff Road, HessleDrainage
Common Lane, WeltonDrainage
Dalegate, Bishop BurtonDrainage
Beverley and Central - DrainageDrainage
Haltemprice - DrainageDrainage
Holderness - DrainageDrainage
Howdenshire - Drainage RepairsDrainage
Yorkshire Wolds - Drainage RepairsDrainage
B1255 Marton Road , BridlingtonFootway
Little Weighton Road, SkidbyFootway
Riplingham Road, West EllaFootway
Church Lane, ThwingFootway
Goole Various Site, GooleFootway
Kingston Avenue, HessleFootway
Trafford Road, WillerbyFootway
West Leys Park, SwanlandFootway
Gowdall BridgeSafety Fencing
West Newton BridgeStructure

Specific Sites 2024/25

LocationMaintenance of
Drain Lane, Newport Carriageway
Market Weighton Road, Holme on Spalding Moor Carriageway
Hull Road, Woodmansey Carriageway
B1230 Selby Road, Howden Carriageway
Beverley Road, Anlaby Carriageway
Skipsea Road, Atwick Carriageway
Skipsea Road, Beeford Carriageway
Magdelengate, Hedon Carriageway
Souttergate, Hedon Carriageway
Main Street/Duckmutton Lane, Great Kelk Carriageway
Catwick Road, Long Riston Carriageway
Staithes Road, Preston Carriageway
Princess Road, Market Weighton Carriageway
Willitoft Lane, Wressle Carriageway
Aike Lane, Aike Carriageway
Chapel Lane, Aike Carriageway
Dog and Duck Lane. Beverley Carriageway
Flemingate, Beverley Carriageway
Ropery Close, Beverley Carriageway
School Lane, Beverley Carriageway
Spencer Street, Beverley Carriageway
Walkergate, Beverley Carriageway
Fisher Street, Etton Carriageway
Alpha Avenue, Molescroft Carriageway
Danesway, Molescroft Carriageway
Pighill Lane, Molescroft Carriageway
Saxon Rise, Molescroft Carriageway
Woodhall Park, Molescroft Carriageway
Beverley Parklands, Woodmansey Carriageway
The Green, North Newbald Drainage
Southgate, Market Weighton Footway
Area-wide Minor Footway Treatment Footway
West Newton Bridge Structures
A164 supporting LiveLabs Light Reduction Initiative Street Lighting
Safety barriers Street furniture
Stamford Bridge Traffic Signals

Who can I contact for more information?

The highways asset management team can be contacted on:

Email: transport.policy@eastriding.gov.uk

Local Highways Maintenance Transparency Report

In line with the Department for Transport’s requirements, we have published our Local Highways Maintenance Transparency Report to show how our funding allocation is used to better inform the public on our highway maintenance procedures.

You can download the reports below:

Subscribe to East Riding of Yorkshire Council

Stay updated on the latest East Riding news

We use GovDelivery to send you emails, which is secure and you can choose to stop receiving emails at any time.

Find out more in our Privacy notice.

Subscribe to East Riding News
Title
Modified
Size

Alerts